This project was located in the RiNo district of Denver at the corner of Blake Street and Broadway. We were tasked with paying attention to stormwater management and grading while making the site a place to create community. My instructors preferred that we did most of the project by hand.
Area of site | 14,436 ft2 |
Date | December 2022 |
Status of the project | Student Assignment |
Tools used | Hand drafting tools, Illustrator, Photoshop |
When the project was assigned, the dog park and tables were not there. The site is entirely concrete, and we were told to keep the sculpture, but it could be moved. The area's main purpose is to filter stormwater runoff into the Platte River through use of grates at the North end of the site.
This portion was done in a group. We were tasked with analyzing the Urban Heat Island aspects of the site. We found that the site had lots of heavy traffic surrounding it, and very little vegetation. The site itself was also all concrete.
This was my first idea with general layout/programming of the site.
This was my first attempt at getting into more detail.
This is the iteration where it started to change a good amount. The final is closest to this one.
This assignment was the first introduction to a site outside of our campus. It was interesting to have a site I wasn't used to.