Casa DCDC

Project details

The renovation and energy efficiency improvement project for the apartment encompassed several key elements:

  1. Internal Layout Redesign: The apartment's internal layout was reconfigured to optimize space utilization and functionality.

  2. Heated Parquet Flooring: A heated parquet floor with a herringbone pattern was meticulously designed and installed to enhance comfort and energy efficiency.

  3. Integrated Ceiling Systems: The ceiling design was strategically planned to accommodate a ducted air conditioning and mechanical ventilation system, contributing to improved indoor air quality and energy conservation.

  4. Enhanced Bathroom and Kitchen Surfaces: Special attention was devoted to the selection and installation of premium materials for bathroom and kitchen surfaces, elevating the aesthetics and functionality of these spaces.

  5. Visual Enhancement with Glass Doors: Glass doors were strategically incorporated to maximize natural light and create a sense of openness, enhancing the apartment's overall appeal and luminosity.

The project successfully combined aesthetic improvements with energy-efficient solutions to create a modern, comfortable living space while optimizing energy usage and sustainability.

Area of site

140 mq

Date

2021-2023

Status of the project

Completed